PARTS LISTINCLUDEDFrymaster, a member of the Commercial Food Equipment Service Association, recommendsusing CFESA Certified Technicians.Price: $10.002
BID80 SERIES GAS FRYERSCHAPTER 2: IMPORTANT INFORMATION2-22.4 Pre-Installation (cont.)2. Frymaster BID80 Series gas fryers require 120VAC 60 cycle
BID80 SERIES GAS FRYERSCHAPTER 2: IMPORTANT INFORMATION2-32.4 Pre-Installation (cont.)3. CE/EXPORT STANDARDS: Fryer installation must conform with
BID80 SERIES GAS FRYERSCHAPTER 2: IMPORTANT INFORMATION2-42.7 Receiving and Unpacking EquipmentA. Check that the container is upright. Use an outwa
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-13.1 Installing the FryerA. Initial Installation: If the fryer is installed with legs, do not push
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-23.3 Installing Casters and LegsA. Install casters and/or legs near where the fryer is to be used,
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-33.4 Gas Connections DANGERBefore connecting new pipe to this appliance the pipe must be blown out t
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-43.4 Gas Connections (cont.) DANGERAll connections must be sealed with a joint compound suitable for
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-53.4 Gas Connections (cont.)E. Manifold Pressure: Only qualified personnel should check the manifo
BID80 SERIES GAS FRYERSCHAPTER 3: INSTALLATION3-63.4 Gas Connections (cont.)3. If disconnection of the restraint is necessary, this restraint must
BID80 SERIES GAS FRYERSCHAPTER 4: FRYER OPERATIONS4-14.1 Initial Start-up WARNINGThe on-site supervisor is responsible for ensuring that operators a
Please read all sections of this manual and retain for future reference. NOTICE This appliance is intended for professional use only and is to be o
BID80 SERIES GAS FRYERSCHAPTER 4: FRYER OPERATIONS4-24.1.1 Pilot Lighting Procedures, Electronic Ignition Systems (cont.)3. The electric module wil
BID80 SERIES GAS FRYERSCHAPTER 4: FRYER OPERATIONS4-34.2 Boil-Out Procedure (cont.)C. Press the switch. will appear in the left display.D. En
BID80 SERIES GAS FRYERSCHAPTER 4: FRYER OPERATIONS4-44.3 Final Preparation (cont.) WARNINGNEVER set a complete block of solid shortening on top of t
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-1 WARNINGDrawings and photos used in this manual are intended to illustrate operational,cleani
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-25.1 GeneralFrymaster BID80 Series fryers come equipped with a built-in filtration system. P
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-35.2 Filtration PreparationOn initial installation and before each use, remove all loose part
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-45.2.1 Assembling the Filter (cont.)Assemble the filter as follows:1. Place the support grid
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-55.2.1 Assembling the Filter (cont.)4. Sprinkle 8 ounces of filter powder on thefilter sheet
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-65.2.2 Installing the FilterSlide the filter inside the fryer cabinet. Ensurethe male-female
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-75.3.2 Filtering ToolsAssemble tools to be used for filtering. These are supplied with the f
DANGERAdequate means must be provided to limit the movement of this appliance without dependingupon the gas line connection. Single fryers equipped
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-85.4 Operating the Filter (cont.) DANGERDo not drain more than one frypot at a time into the
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-95.4.2 Filter Operation CAUTIONNEVER operate the filter unit unless cooking oil/shortening is
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-105.4.2 Filter Operation (cont.)4. After ensuring the filter pan is correctlypositioned unde
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-115.4.2 Filter Operation (cont.)6. Oil will begin to pump from the filter paninto the frypot
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-125.4.2 Filter Operation (cont.)9. After all oil is pumped back into the frypot,bubbles will
BID80 SERIES GAS FRYERSCHAPTER 5: BUILT-IN FILTRATION5-135.4.2 Filter Operation (cont.)12. Do not allow crumbs to accumulate in thecrumb tray. The
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–16.1 Operating Fryers with Computer Magic III.5 Computers12453867ITEM DESCRIPTION1 Lighted Dis
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–26.1.1 Equipment Setup and Shutdown ProceduresSetup WARNINGFill the frypot to the bottom OIL L
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–36.1.1 Equipment Setup and Shutdown Procedures (cont.)d. " " indicating that the fr
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–46.1.1 Equipment Setup and Shutdown Procedures (cont.)5. At this time, the hold time will be
BID80 Series Gas FryersInstallation & Operation ManualTABLE OF CONTENTS Page #1. INTRODUCTION
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–56.2 Programming the Computer Magic III.5 Computer (cont.)Sensitivity adjusts computer-cooking
BID80 SERIES GAS FRYERSCHAPTER 6: COMPUTER OPERATION6–66.2.1 Boil Feature (cont.)2. To program computer for boil feature, press either switch.3. P
BID80 SERIES GAS FRYERSCHAPTER 7: PREVENTATIVE MAINTENANCE7-17.1 General DANGERNever attempt to clean the fryer during the cooking process or when t
BID80 SERIES GAS FRYERSCHAPTER 7: PREVENTATIVE MAINTENANCE7-27.4 Periodic/AnnualThis appliance should be inspected and adjusted periodically by qual
BID80 SERIES GAS FRYERSCHAPTER 7: PREVENTATIVE MAINTENANCE7-37.4 Periodic/Annual (cont.)Built-in Filtration (cont.):• Check filtration system integ
BID80 SERIES GAS FRYERSCHAPTER 8: TROUBLESHOOTING8-18.1 General DANGERHot cooking oil/shortening will cause severe burns. Never attempt to move thi
BID 80 SERIES GAS FRYERSCHAPTER 8: TROUBLESHOOTING8-28.2 Pilot Burner Malfunction (cont.)4. Check all connections for cleanliness and security.C.
BID 80 SERIES GAS FRYERSCHAPTER 8: TROUBLESHOOTING8-38.3 Main Burner Malfunctions (cont.)D. Fryer will not reach the temperature setting and/or run
BID 80 SERIES GAS FRYERSCHAPTER 8: TROUBLESHOOTING8-48.4 Wiring Diagrams8.4.1 BID80 Series With Built-In FiltrationOPTIONAL HEAT TAPEHEAT TAPE-240V
BID 80 SERIES GAS FRYERSCHAPTER 8: TROUBLESHOOTING8-58.4.2 BID80 Series Interface Board (Enlarged View)RIGHTTEMPPROBE4J387R-HEATLED 4RL-3R-GVLED 5RP
BID80 Series Gas FryersInstallation & Operation ManualTABLE OF CONTENTS (CONT.) Page #5. BUILT-IN FILTRATION
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-19.1 Accessories1 234 5ITEM PART # COMPONENT1 803-0301 Basket, Fry- 6 x 8-¾ x 16-¾ (Optional)2 810-21
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-29.2 Cabinetry and Related Components1234567211514191320172322181612111098
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-39.2 Cabinetry and Related Components (cont.)ITEM PART # COMPONENT1 211-2532 Side, Cabinet- Left2 210-
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-49.3 Computer and Related Components4 5 78911 106121 2 313 14151516
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-59.3 Computer and Related Components (cont.)ITEM PART # COMPONENT1 210-3463 Panel, Control- BID802 106
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-69.4 Drain Valve Components12378645101191213ITEM PART # COMPONENT1 106-1401 Bracket, Microswitch2 210-
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-79.5 Filter Pan Components12346758ITEM PART # COMPONENT1 823-3750SP Filter Pan Assembly* 813-0684 Plug
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-89.6 Frypot, Burners and Related Components123456789101112131414151516171819202829302526272122232431
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-99.6 Frypot, Burners and Related Components (cont.)ITEM PART # COMPONENT1 823-3396SP Frypot, SS- 1-½&q
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-109.7 Oil Return Components2214134151617181920272824 25262221231To Frypot23445526678910101111121413129
BID80 SERIES GAS FRYERSCHAPTER 1: INTRODUCTION1-11.1 After PurchaseIn order to improve service, have the following chart filled in by the Frymaster
BID80 SERIES GAS FRYERSCHAPTER 9: PARTS LIST9-119.7 Oil Return Components (cont.)ITEM PART # COMPONENT1 813-0460 Nipple, ½ x 3" NPT MB2 813-006
THIS PAGE INTENTIONALLY LEFT BLANK
Frymaster, L.L.C., 8700 Line Avenue, PO Box 51000, Shreveport, Louisiana 71135-1000Shipping Address: 8700 Line Avenue, Shreveport, Louisiana 71106T
BID80 SERIES GAS FRYERSCHAPTER 1: INTRODUCTION1-21.4 Computer Information (cont.)The user is cautioned that any changes or modifications not express
BID80 SERIES GAS FRYERSCHAPTER 1: INTRODUCTION1-31.6.1 Definitions (cont.)B. Qualified Installation Personnel1. Qualified/authorized personnel are
BID80 SERIES GAS FRYERSCHAPTER 2: IMPORTANT INFORMATION2-12.1 Product DescriptionFrymaster BID80 Series gas fryers are energy-efficient, tube-style,
Commentaires sur ces manuels